Barenco

THE DESIGN, MANUFACTURE AND SUPPLY OF HARDWARE, CABLE AND CONNECTORS TO THE COMMUNICATIONS INDUSTRY

T:+44 (0)1949 860400
F:+44 (0)1949 860773
E:sales@barenco.co.uk
Your Basket

You have no items in your shopping cart.

View all your basket items
Order Code: 153080

MONO EARHANGER WITH 2.5mm R/A PLUG 1.25m LONG LEAD (KENWOOD) - 153080

Double click on above image to view full picture

Zoom Out
Zoom In
  • MONO EARHANGER WITH 2.5mm R/A PLUG 1.25m LONG LEAD (KENWOOD) - 153080
  • MONO EARHANGER WITH 2.5mm R/A PLUG 1.25m LONG LEAD (KENWOOD) - 153080
  • MONO EARHANGER WITH 2.5mm R/A PLUG 1.25m LONG LEAD (KENWOOD) - 153080

MONO EARHANGER WITH 2.5mm R/A PLUG 1.25m LONG LEAD (KENWOOD) - 153080

Colour Black
Finish No
Overall Length mm 1.25m
Quantity 1
  • 1+ £1.90Exc. VAT
  • 25+ £1.70Exc. VAT
or call to order:
01949 860 400

Description

Mono earhanger designed to fit comfortably to one ear, with the band behind the ear holding the earpiece securely in place. Suitable for use on left or right ear. Impedance 8Ω Response 20Hz - 20kHz Power 100mW max. Lead Length 1.25m